Work progressing on the turret.
Drew several templates at slightly different sizes and settled on this one.
It is for placement of the vertical pillars tying the turret to the floor in the turret base. It seems to line up well with the slots in the floor... Phew!
View attachment 193071
Testing the tenon that slips into the turret floor
View attachment 193072
Then cutting the rim notches, gluing and test fitting for height.
View attachment 193073
At first, the pillars were about 1mm too high, so the deck of the tank body would not sit properly with the turret base ring inserted in the deck.
After adjusting the pillar length, it seems I still need to shave off a hair for a perfect fit.
Job for tomorrow when I'm fresh.