Last for the day I think. Just about wrapped up on puttywork on the nacelles.[ATTACH=full]88206[/ATTACH]
Got the intercoolers painted and clearcoated. So once the main necelles are done the intercoolers can be installed.
And test fit the dorsal and saucer. The gap between the two seems a bit large, even though that gap is supposed to be noticable. Before I install the dorsal permanently I may file the top of the attachment section down some.[ATTACH=full]88207[/ATTACH]
And will be ordering a 3 lb block of steel to weigh down the bottom of the stand, and also gonna order a gold Starfleet emblem from Etsy for the base.