So despite being in a VERY foul mood due to some stupid crap my boss pulled at the end of the shift last night(Sat), I decided to do a bit of work. I made the ring and clear donut as Trekriffic did for the bridge, and did the B deck windows. I tacked them in place with carefully placed dots of CA, then filled the windows in with Micro Kristal Kleer. Gonna let dry overnight. The idea with the MKK is to hopefully fill any gaps and ideally make the windows flush to the hull.[ATTACH=full]87933[/ATTACH][ATTACH=full]87934[/ATTACH]
I will fix the gap on the white ring once all the parts are set up.