And, here's the first build update! ;D
This is my humble machining area! It took me ~3 months to acquire, install, and setup:
[ATTACH=full]55741[/ATTACH]
I bought all raw materials from eBay - 6061 aluminum and stainless steel:
[ATTACH=full]55742[/ATTACH]
Here's the first shop drawing!
[ATTACH=full]55743[/ATTACH]
This project required a 4-jaw chuck to hold the square stock. This was the first facing operation on the ED-209!
[ATTACH=full]55744[/ATTACH]
I learned quickly that machining required tools. Lots and lots of tools. I built tools to build tools that helped me to build the actual parts. Seriously. Here you see the "T" stop I made and a tapping guide. The tapping guide was critical to keep from breaking $8 #2-56 taps:
[ATTACH=full]55745[/ATTACH]
First holes drilled and tapped:
[ATTACH=full]55746[/ATTACH]
This is the start of the footpad. I turned a section of 2"x2"x1/4" aluminum to get the final part:
[ATTACH=full]55747[/ATTACH]
[ATTACH=full]55748[/ATTACH]
After some milling (sorry for the blur):
[ATTACH=full]55749[/ATTACH]
Here's the first assembly:
[ATTACH=full]55750[/ATTACH]
I'll have some build time this weekend. I'll post an update for sure. Thanks for following along!