Reply to thread

Re: A Reliant Bash--ISS Amazon--WIP 03/02


After filling the strut slots and air pockets in the nacelles, I sanded the putty work tonight.

http://s432.photobucket.com/albums/qq45/quaralane/Trek/Federation-non-Canon/Amazon-ISS-Breakstone/amazon-ISS-09.jpg


After gluing the shuttlebay into the main hull, I glued the upper and lower halves together.

Then, with a cutting disk in my Dremel, I made the rough cutouts in the hull.

I did my best to stay 1/8" to 1/16" off my guide lines to allow for error.

http://s432.photobucket.com/albums/qq45/quaralane/Trek/Federation-non-Canon/Amazon-ISS-Breakstone/amazon-ISS-10.jpg

http://s432.photobucket.com/albums/qq45/quaralane/Trek/Federation-non-Canon/Amazon-ISS-Breakstone/amazon-ISS-11.jpg


Back
Top