Reply to thread

Good afternoon.


More work on the Refit.

 First installed the left Nacelle.


[ATTACH=full]76605[/ATTACH]


 The procedure is actually simple with the jig. First glue one of the pylons to the hull. Adjust its position such that the skin flange is level with the jig's cross braces and let dry. When cured attach the nacelle and hold it in position with and elastic. Let the glue cure. When dry repeat process with the other Nacelle assembly.


[ATTACH=full]76606[/ATTACH]


[ATTACH=full]76607[/ATTACH]


[ATTACH=full]76608[/ATTACH]


[ATTACH=full]76609[/ATTACH]


When all is cured the ship was removed from the jig.

 This is the finished ship.


[ATTACH=full]76610[/ATTACH]


[ATTACH=full]76611[/ATTACH]


[ATTACH=full]76612[/ATTACH]


[ATTACH=full]76613[/ATTACH]


 Will now move on to the next phase, the building of the shadow box.


Thank you for following.

Questions and comments welcome.


 Jim


Back
Top