Good evening.
With the folding of the frames for the dock, it is now time to assemble.
First, we have to assemble the operations deck for the dock. This is mainly a type of box fold with angular sides.
Upon test fitting, found that this piece need a reinforcing superstructure. With that done it was glued together.
[ATTACH=full]76244[/ATTACH]
[ATTACH=full]76245[/ATTACH]
The completed assembly was then attached to the top inside of the main frame and left to dry.
Operations deck installed on to main frame.
[ATTACH=full]76246[/ATTACH]
With that done it was now time to install the side frames. These were glued in place one at a time the help in a press till dry.
Here is the completed main assembly of the space dock.
[ATTACH=full]76247[/ATTACH]
[ATTACH=full]76248[/ATTACH]
[ATTACH=full]76249[/ATTACH]
[ATTACH=full]76250[/ATTACH]
[ATTACH=full]76251[/ATTACH]
I will now have to put this away for safe keeping while I start on the Refit.
Thank you for following.
Questions and comments welcome.
Jim