eh up all,
here is the next bit,i hold ya they would be coming at ya thick and fast.
well i said i'd get into the transport loader,and that is what this one's all about.
first off i did some research by workin empire over and over and drawing up a few pictures of bit's i needed to get started but some angles i couldn't find at the start but i had enough to get goin.
here i started on the flatbed and the curved sides.
[ATTACH=full]75621[/ATTACH]
here is the bottom view
[ATTACH=full]75622[/ATTACH]
next you can see the curved side in place which i used half mm styrene just cos it bend's alot easier.
on the next image you can see both sides are done and i've started on some of the detail on the front.
[ATTACH=full]75623[/ATTACH]
the same procedure for the sides i had with the back.
[ATTACH=full]75624[/ATTACH]
next i started on the pilot's/driver's standing area.
[ATTACH=full]75625[/ATTACH]
[ATTACH=full]75626[/ATTACH]
next you see the basic shape coming together.
[ATTACH=full]75627[/ATTACH]
i gave it a coat of paint the same way as i did on the maintenance station.
[ATTACH=full]75628[/ATTACH]
[ATTACH=full]75629[/ATTACH]
and i started knockin up the detail for the back of the pilot's standing station.
[ATTACH=full]75630[/ATTACH]
it's nearly done now i got the footpedal and the stearing control finished off.
[ATTACH=full]75631[/ATTACH]
while i was buildin this i desided on it being an maintenance and re armament dio,so the next step was to make up some accessories and another crewman.first off i made a winch cable holder for new cable and a carriage for the harpoon gun,but you wont see the carriage for the gun for awhile and to honest it's not that special.
[ATTACH=full]75632[/ATTACH]
next up i started makin up some of the boxes like san loads up when he's on gonna pay gabba off.
[ATTACH=full]75633[/ATTACH]
[ATTACH=full]75634[/ATTACH]
the last image is of 2 of the 3 boxes finished off,hope you like cheers for lookin...peza ;D