Ello,
Well, what can i say.
Squeezed a few hours in
Had to adapt a few things,
But
I made some progress
Ready, is everyone in, a quick update, approx 10, 1/2 hours work,
Lets go
During my sick time i spent some dough
[ATTACH=full]76399[/ATTACH]
10" Bench top pillar drill, 18 pcs hole saw set including arbour, 3 piece step drill set from 1/16" to 3/4" in 1/16" steps, including delivery.
Guess, go on guesss.
$93, thats 58 quid, for the lot.
Then i tidied up the cave
[ATTACH=full]76400[/ATTACH]
[ATTACH=full]76401[/ATTACH]
Then it was back to the Prometheus
Engines build up.
Cut out all pieces for the bottom nozzel assembly
[ATTACH=full]76402[/ATTACH]
Had to use sizzors instead of a knife
Did three sets
[ATTACH=full]76403[/ATTACH]
Top rings
[ATTACH=full]76404[/ATTACH]
Sides and top rings fitted and trimmed
[ATTACH=full]76405[/ATTACH]
Three done
[ATTACH=full]76406[/ATTACH]
Fiddled with this for a night and managed to fit the front wing
[ATTACH=full]76407[/ATTACH]
Outer nozzel covers
[ATTACH=full]76408[/ATTACH]
Rough Trimmed
[ATTACH=full]76409[/ATTACH]
Inners glued and basic shaped
[ATTACH=full]76410[/ATTACH]
Action shots
[ATTACH=full]76411[/ATTACH]
[ATTACH=full]76412[/ATTACH]
Thats about the story so far.
Just wanted to thank all the people who supported me though my wrist malfunction
Your support and kind words ment alot to me.
Thank you friends
Gag
Tony
Toe